Use this URL to cite or link to this record in EThOS: https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.734150
Title: A study of designer time utilisation in Iranian construction consultancies
Author: Shourkabi, Amir
ISNI:       0000 0004 6497 439X
Awarding Body: Loughborough University
Current Institution: Loughborough University
Date of Award: 2016
Availability of Full Text:
Access from EThOS:
Access from Institution:
Abstract:
Productivity improvement within the construction industry has addressed issues that are predominantly associated with activities and tasks on construction sites, and less so in the office work. The lack of an understanding of the proportion of productive time during working hours for designers, as well as the measurement method forms a significant gap in the knowledge of the design process. Productivity management cycle comprised of 4 phases: measurement; evaluation; planning; and improvement. Therefore, measurement becomes essential in productivity improvement. This study identifies the lack of defined duration for design task and measurement of design activity time as an essential gap in the productivity knowledge that relates to designers.
Supervisor: Not available Sponsor: Not available
Qualification Name: Thesis (Ph.D.) Qualification Level: Doctoral
EThOS ID: uk.bl.ethos.734150  DOI: Not available
Keywords: Productivity ; Design activities time ; Construction project ; Measurement
Share: