Title: Controlling schedule duration during software project execution
Author: Ahmedshareef, Zana
ISNI:       0000 0004 5363 4357
Awarding Body: University of Brighton
Current Institution: University of Brighton
Date of Award: 2015
Availability of Full Text:
Access from EThOS:
Access from Institution:
Abstract:
This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling software projects have been investigated, there still seemed to be more to be learned about the interplay of a range of factors during project execution and that affect project duration when developing and integrating software systems within enterprise architecture environment.
Supervisor: Not available Sponsor: Not available
Qualification Name: Thesis (Ph.D.) Qualification Level: Doctoral
EThOS ID: uk.bl.ethos.667851  DOI: Not available
Keywords: G000 Computing and Mathematical Sciences