Use this URL to cite or link to this record in EThOS: http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.646168
Title: Generalised cost benefit analysis for large infrastructure projects : the case of the Channel Tunnel rail link
Author: Naghashian, Mohammad Hossein
ISNI:       0000 0004 5360 9768
Awarding Body: University of Birmingham
Current Institution: University of Birmingham
Date of Award: 2015
Availability of Full Text:
Access from EThOS:
Full text unavailable from EThOS. Thesis embargoed until 31 Dec 2018
Access from Institution:
Abstract:
Even in the absence of specific evidence it is surely unthinkable to imagine Napolean Bonaparte himself, when considering the potential benefits of invading England, failing to weigh against them the costs of building a tunnel under \(La\) \(Manche\). In the light of the considerable literature of cost benefit analysis (CBA) and by gathering together several analyses that have been performed on the Channel Tunnel in more recent times, this thesis demonstrates that a comprehensive ‘big picture’ CBA framework is missing, and then provides one: a new methodology, represented in Data Flow Diagram (DFD) form, for the generalised cost benefit analysis of large infrastructure projects.
Supervisor: Not available Sponsor: Not available
Qualification Name: Thesis (Ph.D.) Qualification Level: Doctoral
EThOS ID: uk.bl.ethos.646168  DOI: Not available
Keywords: HF Commerce ; TF Railroad engineering and operation ; TJ Mechanical engineering and machinery
Share: