Use this URL to cite or link to this record in EThOS:
Title: Time cost models : their use in decision making in the construction industry with particular reference to the use of the microcomputer
Author: Cusak, M. M.
Awarding Body: University of Bath
Current Institution: University of Bath
Date of Award: 1981
Availability of Full Text:
Access through EThOS:
No abstract available
Supervisor: Not available Sponsor: Not available
Qualification Name: Thesis (Ph.D.) Qualification Level: Doctoral
EThOS ID:  DOI: Not available
Keywords: Electronics and electrical engineering Electric engineering Computer science Management