Use this URL to cite or link to this record in EThOS:
Title: The modelling of factors influencing observed manpower productive time within the site production process
Author: Osman, Omar
Awarding Body: Heriot-Watt University
Current Institution: Heriot-Watt University
Date of Award: 1989
Availability of Full Text:
Access through EThOS:
Access through Institution:
No abstract available
Supervisor: Not available Sponsor: Not available
Qualification Name: Thesis (Ph.D.) Qualification Level: Doctoral
EThOS ID:  DOI: Not available
Keywords: Construction productivity